Projects
Electrical infrastructure projects delivered across Kosovo’s power network.
Monten’s project experience includes substation reconstruction, new substation
delivery, transformer installation, metering infrastructure, and GIS substation
work. These projects support stronger supply security, improved system reliability,
and better power distribution for communities, institutions, and industrial users.
Substation Reconstruction
Reconstruction of 110 kV “Palaj” Substation
This project included the reconstruction of the 110 kV “Palaj” Substation and
the construction of a new 110/35 kV line, strengthening supply security for
industrial users, pumping infrastructure, and nearby communities.
New Substation
110/10(20) kV “Prishtina 7” Substation
Built with installed power of 2 x 40 MVA, this substation improved service for
multiple neighborhoods, supported the water utility and mining operations, and
strengthened supply security for critical loads including QKUK.
Transformer Installation
TR3, 40 MVA at 110/10(20) kV “Prishtina 2”
Installation of the TR3 40 MVA transformer at the 110/10(20) kV “Prishtina 2”
substation, supporting increased transformation capacity and improved reliability
within existing high-value infrastructure.
Metering
Commercial Border Metering Group Installation
Monten installed measurement groups and upgraded metering systems across 400 kV,
220 kV, and 110 kV interconnection lines, improving commercial measurement
accuracy and system reliability.
GIS Infrastructure
Prishtina, Fushe Kosova, Mitrovica, Theranda, Drenasi
GIS substation delivery across multiple locations, including work as a
subcontractor to ABB entities, contributing to stronger supply security, lower
distribution losses, and better power flow optimization.